GenCorp Automotive Body Components Plant

  • Reduced Peak Demand 500 KW
  • Reduced electrical consumption 100,000 KWH per month
  • Payback on investment: less than 1 year
  • Project won top award in Six Sigma Program
  • Identified as the No. 1 opportunity to improve profits Corporate-wide

Kosmos Cement Plant

  • Reduced Peak Demand 2,250 KW 
  • Reduced electrical consumption 200,000 KWH per month
  • Payback on investment: less than 1 year
  • Saved more than $100,000 in one day by averting catastrophic failure of 3,000 Hp motor.

RCA Thomson Consumer Electronics Injection Molding and Assembly Plant

  • Reduced Air Compressor costs 20%
  • Reduced Injection Molding Press costs 50%

General Electric Appliances Plant

  • Reduced annual Air Compressor electric costs by 20%
  • Payback on investment: 3 months

Golden Castings

  • Reduced annual utility costs by 21%
  • Payback on investment: 3 months

Mariah Meat Packing Plant

  • Identified annual utility costs savings opportunities of 40%
  • Found 400 ton false load in the refrigeration system

Honda Fuel System Components Plant

  • Provided reports breaking down $2,000,000 annual utility costs by Department, Shift, Product Line and Equipment

Rexnord Heat Treat and Assembly Plant

  • Reduced Annual Utility Costs by more than 25%
  • Utility costs assigned to each department manager